EDC / ePRO Layout Considerations
Topics:
This post was triggered by a lively discussion in the Linkedin SCDM group - part of the credit goes to that group. The purpose I have here is to summarize the discussion and to share some of the related materials. How important is the EDC layout? In the paper CRF days, the CRF design was relatively flexible and free form....
Read More